Executive Summary
Seven VA healthcare and services contracts totaling $130,449,729 in obligations were reviewed, all civilian (0 of 7 defense-related), with the Department of Veterans Affairs as the sole buyer across construction, facility repair, and one IT legacy-systems task order.
Every contract is a firm fixed-price award set aside for service-disabled veteran-owned small businesses (SDVOSB), and the mean signal strength is 3.0/10, so the stream carries little bullish or bearish conviction. The highest-materiality items are the $21,190,712 Bridger National Construction emergency department expansion (Cheyenne, WY) and the $21,153,679 TL Services EHRM infrastructure award at Lake City VAMC, but none of the recipients is identified as publicly traded, so the stream offers no direct equity exposure. The most informative datapoint is CLIENT FIRST TECHNOLOGIES, INC's $16,267,923 delivery order, which is about 65% outlayed ($10,542,609) and is the only award showing meaningful execution. The key watch item is that six of seven awards show $0 outlayed, so realized revenue and execution pace remain unverified across most of the stream.
Materiality, sentiment, and priority are scored by Gunpowder’s analysis pipeline. How we score filings →
Tracking the trend? Catch up on the prior VA Healthcare & Services Contracts digest from October 11, 2026.
Investment Signals (7)
- CLIENT FIRST TECHNOLOGIES, INC: $16.27M VA legacy systems task order is 65% outlayed (MEDIUM)▲
The firm fixed-price delivery order (NAICS 541512) has $10,542,609 outlayed against a $16,267,923 obligation, the only award in the set showing material execution. Remaining balance of roughly $5.7M runs through 2027-09-01, and the recipient's public status is not established.
- Bridger National Construction LLC: $21.19M VA emergency department expansion, no outlays yet (LOW)▲
The largest single award in the set is a firm fixed-price construction contract in Cheyenne, WY running to 2027-06-03, with $0 outlayed to date. Straight-line estimate is about $10.6M per year, but the recipient is a private LLC with no identified public parent.
- TL Services, Inc.: $21.15M VA EHRM infrastructure upgrade at Lake City VAMC (LOW)▲
The firm fixed-price award supports Electronic Health Record Modernization infrastructure through 2028-09-14, with $0 outlayed. Cost overrun risk falls on the contractor, but the recipient is not identified as publicly traded.
- Sergents Mechanical Systems: $17.89M VA roof and HVAC replacement, Building 9 (LOW)▲
The SDVOSB set-aside firm fixed-price contract runs from 2025-07-11 to 2028-03-17 with $0 outlayed, and it is a private company per the data. Revenue recognition depends on construction milestones not stated in the record.
- FDCD II Joint Venture: $17.61M VA Building 58 renovation, no outlays yet (LOW)▲
The joint venture's firm fixed-price renovation award at Coatesville, PA runs through 2027-08-05, with $0 outlayed. It is a single project with no identified listed parent, so recurring revenue visibility is limited.
- RHI LLC: $19.89M VA Tomah outpatient clinic expansion, no outlays recorded (LOW)▲
The SDVOSB set-aside firm fixed-price construction contract for the B404 clinic expansion in Tomah, WI runs to 2027-03-31 with $0 outlayed. The company is listed as its own parent, so no public equity exposure is indicated.
- PROJECT MANAGEMENT SOLUTIONS LLC: $16.45M VA Caribbean hurricane recovery, Phase 2 (LOW)▲
The design-build firm fixed-price award (36C248) runs from 2022-06-15 to 2027-08-30 with $0 outlayed recorded. Execution is unverified, and the recipient is a privately held SDVOSB with no public parent.
Risk Flags (3)
- Execution [MEDIUM RISK]▼
Six of seven awards show $0 outlayed at the time of data, including the four largest construction contracts, so realized revenue and performance progress cannot be confirmed for most of the $130.4M stream.
- Concentration [LOW RISK]▼
All seven awards are to small, mostly private SDVOSB set-aside recipients, so the stream provides no exposure to large publicly traded prime contractors and the investable read-through is minimal.
- Budget [LOW RISK]▼
The data covers a single day of awards, so no multi-year VA construction budget trend can be established, and the stream cannot confirm whether facility spending is rising or falling.
Opportunities (2)
- ◆
CLIENT FIRST TECHNOLOGIES, INC is positioned for follow-on work given its HUBZone, SDVOSB, and self-certified SDB status, combined with the active T4NG legacy-systems task order.
- ◆
VA facility renovation volume across Bridger, TL Services, Sergents, FDCD II, RHI, and PROJECT MANAGEMENT SOLUTIONS represents roughly $115M of construction obligations that could expand through modifications or Phase 3 awards.
Sector Themes (2)
- ◆
Five of the seven awards are VA construction or renovation contracts (NAICS 236220, PSC Y1DA/Z1DA/Z2DA) totaling roughly $98M, all reserved for service-disabled veteran-owned small businesses. The pattern signals sustained VA capital facility spending channeled to small firms rather than large public contractors.
- ◆
CLIENT FIRST TECHNOLOGIES' T4NG legacy-systems task order and TL Services' EHRM infrastructure award show VA spending on IT and health-record modernization alongside facility work, though IT content is a small share of the stream.
Watch List (4)
- 👁
{"entity" => "CLIENT FIRST TECHNOLOGIES, INC", "reason" => "Only award in the set with material outlays ($10,542,609 of $16,267,923), with roughly $5.7M remaining through 2027-09-01.", "trigger" => "Modifications to the obligation or follow-on T4NG task orders before the 2027-09-01 end date"}
- 👁
{"entity" => "Bridger National Construction LLC", "reason" => "Largest single award in the set at $21,190,712 with $0 outlayed; execution pace is the key unknown.", "trigger" => "First outlay reporting and any modification to the 2027-06-03 end date"}
- 👁
{"entity" => "TL Services, Inc.", "reason" => "$21,153,679 EHRM infrastructure award with $0 outlayed and firm fixed-price cost overrun exposure.", "trigger" => "Change orders or cost increases under the firm fixed-price structure"}
- 👁
{"entity" => "Department of Veterans Affairs facility construction budget", "reason" => "Five construction awards totaling roughly $98M reflect ongoing capital spend, but the data cannot establish a multi-year budget trend.", "trigger" => "Enacted VA appropriations and any continuing resolution affecting FY2027 facility awards"}
Get daily alerts with 7 investment signals, 3 risk alerts, 2 opportunities and full AI analysis of all 7 filings
$30/mo after a 14-day free trial — no credit card required. See pricing or explore intelligence streams.
More from: VA Healthcare & Services Contracts
🇺🇸 More from United States
View all →October 15, 2026
US Pre-Market SEC Filings Roundup — October 15, 2026
US Pre-Market SEC Filings Roundup
October 15, 2026
US Activist Hedge Fund Institutional SEC 13D 13G — October 15, 2026
US Activist Hedge Fund Institutional SEC 13D 13G
October 15, 2026
S&P 500 Financials Sector SEC Filings — October 15, 2026
S&P 500 Financials Sector SEC Filings
October 15, 2026
S&P 500 Consumer Staples Sector SEC Filings — October 15, 2026
S&P 500 Consumer Staples Sector SEC Filings